New Connections

Know more about Enel services

 

Main Questions

Need to install a meter at a new customer unit? Go to an Enel Customer Service Center, but before that, clear up any doubts you may have about new energy connections and check the necessary steps so we can assist you.

 

Important step: Inspection

Once you request a new connection, Enel will schedule an inspection. The visit will take place during business hours, and it is very important that someone responsible is present at the location to receive our technicians.

Attention: The consumer unit number must be visible (number, lot, block, house, etc.). If the location is not easy to identify, arrange a way to facilitate its location before the scheduled day.

 

Internal electrical installations

After the inspection and completion of the service, the circuit breaker will be switched off. If the internal connection is already ready, simply switch it on. Otherwise, have a private electrician make the internal connection and then switch on the circuit breaker.

 

ENEL